Enable JavaScript to ensure AHN Allegheny General Linac C Replacement | AG体育app下载

AG体育app下载

AHN Allegheny General Linac C Replacement

AHN Allegheny General Linac C Replacement
Client

Allegheny Health Network

Location Pin

Pittsburgh, Pennsylvania

  • Renovation
  • 5 months of construction
  • Construction manager at risk

Project Details

The replacement of the Linear Accelerator C on the second level at the hospital required renovations to the area that included shielding modifications, IT/data cabling and communications, and updating the associated control room. Additionally, ancillary spaces were updated including toilet rooms to comply with ADA so that patients have access to the latest advances in level of care.