First Energy Bruce Mansfield

First Energy Bruce Mansfield
Client

First Energy Corp.

Location Pin

Shippingport, Pennsylvania

  • 3,200-linear-foot conveyor system
  • Equipment setting
  • 16,000 yards concrete
  • 1,280 tons structural steel
  • 86,000 square feet 60 mil primary and secondary liner
  • 41,000-square-foot building

Project Details

AG体育app下载 was awarded a contract for the construction of a new dewatering plant with a pump house, utility bridges, barge loading facility, and miscellaneous platforms. The new facility processes 2.5 million to 3.5 million tons of byproduct each year consisting of fly ash, sulfur, and lime, a chemical used as part of a scrubbing process to address sulfur dioxide emissions. We provided the labor, equipment, and materials for the mechanical and electrical systems required to support the dewatering process. We also installed the soiling capping at their Little Blue Run waste facility.