  • Renovation of 107 feet high dam intake structure
  • Erect two temporary steel cofferdams 23 feet wide and 30 feet tall with bypass piping
  • Install two 12 feet by 30 feet wheel gates with lift assemblies
  • 2,530 cubic yards of mass concrete

Project Details

AG体育app下载 installed the upper reservoir emergency shutoff gate for this operating power generating station.