Enable JavaScript to ensure Metal Building Systems at Energy Center | AG体育app下载

AG体育app下载

Metal Building Systems at Energy Center

Metal Building Systems at Energy Center
Client

Confidential Client

Location Pin

Pennsylvania

  • 973 cubic yards of concrete
  • 104 anchor bolts
  • 133 tons of structural steel
  • 15 months of construction

Project Details

AG体育app下载 constructed the metal building systems for an administration/control building, a warehouse building, and a reclaim water treatment building. Self-perform work included the concrete foundations and slabs, the steel erection of buildings, and select interior finishes in the administration control building.